Notes:
-Congratulations on a successful year. Good luck on exams.

Internal Operation Parameters:
Nitrogen Expansion Turbine Carbon Dioxide Power Plant

Gantt Chart (Project Schedule):
Updated 11/01/07: pdf file

Library:
Contents

Reference Documents:
ANSYS Tutorial - Printable
ANSYS Tutorial
Overview of MIT Supercritical CO2 Work
TokyoTech Overview of Supercritical CO2
Heatric PCHEs for Supercritical CO2
Turbomachinery Design for Supercritical CO2
Turbomachinery notes: part 1
Turbomachinery notes: part 2
Comparative Design Study of Carbon Dioxide Gas Turbine and Helium Gas Turbine
Corrosion Testing for Supercritical CO2 Cooled Fast Reactor
Development of a Supercritical Carbon Dioxide Brayton Cycle: Improving VHTR Efficiency and Testing Material Compatability
Study on Corrosion Properties of Pipelines in Simulated Produced Water Saturated with Supercritical CO2
Turbine Design for a Supercritical Carbon Dioxide Gas Turbine Brayton Cycle
Turbine Design for Supercritical CO2 Brayton Cycle
Electricity Production in Nuclear Power Plants-Rankine vs Brayton Cycles
Notes on Proper Presentation Style
PhD Thesis: 'Supercritical Carbon Dioxide Cycle For Next Generation Nuclear Reactors'
PhD Thesis: 'Reactor Physics Design Of Supercritical CO2-Cooled Fast Reactors'
NASA SP-36
Best Practices for CFD
 
This page last updated: 4/08/2008