Name
Title
Author
Comments
DR497-02E-150-001A
Zero Emissions Micro Turbine Team Website
John Vigliotta
 
DR497-02E-150-002A
Library Database
Samantha Cullen
 
DR497-02E-150-003A
Design Requirements
John Vigliotta
 
DR497-02E-150-004A
Cycle Numbering System
John Vigliotta
 
DR497-02E-150-005A
Patent Template
Samantha Cullen
 
DR497-02E-150-006A
Parts Numbering System and Database
Samantha Cullen
 
DR497-02E-150-007A
Budget
Samantha Cullen
 
DR497-02E-150-008A
Minutes and Action Item Log
Samantha Cullen
 
DR497-02E-150-009A
DR and TDR Numbering and Tracking
Samantha Cullen
 
DR497-02E-150-010A
Time Tracking and Financial Equivalency
Samantha Cullen
 

DR4907-03GT-150-001
Initial Plant Layout and Assembly
Joel Rosart
 
DR4907-03GT-150-002
Raven GT Website 2003-2004
Lynne Gumbley
 
DR4907-03GT-150-003
Initial Investigation into ASPEN and its Capabilities as a Performance Model for the 50kW and 100MW GTs
Jen Hiscock
 
DR4907-03GT-150-004
Final Plant Layout and Assembly
Joel Rosart
 
DR4907-03GT-150-005
Meeting Minutes and Action Item Log
Jen Hiscock
 
DR4907-03GT-150-006
Internal CD Creation and Organization
Lynne Gumbley
 
DR4907-03GT-150-007
Chemical Modelling in ASPEN
Jen Hiscock
 
DR4907-03GT-150-008
2003-2004 Budget
Jen Hiscock
 
DR4907-03GT-150-009
2003-2004 Project Hours
Joel Rosart
 
DR4907-03GT-151-001
Internal Component Tracking
Matthew Powers
 
DR4907-03GT-151-002
Time Scheduling
Matthew Powers
 
DR4907-03GT-151-003
Final Plant Layout and Assembly
Matthew Powers
 
DR4907-03GT-151-004
Solid Modeling Alphanumeric Naming System
Matthew Powers
 
DR4907-03GT-151-005
Possible Gross Profit
Matthew Powers
 

TDR4907-03GT-150-001
Guidelines for Slide Presentations
Jen Hiscock
 
TDR4907-03GT-150-002
Safety Issues with High Pressure O2, CO2, and Natural Gas
Joel Rosart
 
TDR4907-03GT-150-003
Parts Database Development and Control
Lynne Gumbley
 
TDR4907-03GT-150-004
Team Email Addresses
Jen Hiscock
 
TDR4907-03GT-151-001
Setup And Maintenance Of An External FTP
Matthew Powers
 

DR4907-04GT-150-001
2004/2005 Zero-Emission Gas Turbine Project Website
Ian Lauder
 
DR4907-04GT-150-002
General Advice for Design Integration
Ian Lauder
 
DR4907-04GT-150-003
2004-2005 Schedule Conclusion
Wesley Sneek
 
DR4907-04GT-150-004
2004-2005 Final Plant Layout
Wesley Sneek
 

TDR4907-04GT-150-001
Scheduling with Microsoft Project
Wesley Sneek
 

TDR4907-05GT-150-001
Creating a Password Protected Subweb on the Project Website
Kent Fowlie
 
TDR4907-05GT-150-002
Exploiting Project Schedule for Team Communication
Aleem Ahmed
 

DR4907-06GT-150-001
100 MW Generator Dimensions and Specifications
Robert Kernaghan
 
DR4907-06GT-150-002
Design of the 2006-2007 Gas Turbine Website
Nhan Tran
 
DR4907-06GT-150-003
100MW Supercritical CO2 Plant Layout
Philip Richard
 
DR4907-06GT-150-004
Cooling Tower Dimensions and Specifications for 100 MW Supercritical Carbon Dioxide Plant
Robert Kernaghan
 
DR4907-06GT-150-005
SUPERCRITICAL CO2 SAFETY ISSUES
Philip Richard
 
DR4907-06GT-151-001
N2 Expansion Turbine Plant Layout
Gordon MacIsaac
 

TDR4907-06GT-150-001
Scheduling with Microsoft Project
Robert Kernaghan
 
TDR4907-06GT-150-002
Curve Fitting With Zunzun.com
Nhan Tran
 
TDR4907-06GT-150-003
Benefits of Website Design Using HTML
Nhan Tran
 
TDR4907-06GT-150-004
Supercritical CO2 Corrosion
Nhan Tran
 
TDR4907-06GT-150-005
Organizing An Initial Assembly In Pro E
Philip Richard
 
TDR4907-06GT-150-006
ENTERING DATA INTO TECPLOT FOCUS OR TECPLOT 360 USING MICROSOFT EXCEL OR NOTEPAD
Rob Kernaghan
 
TDR4907-06GT-150-007
ENGINEERING ERGONOMICS
Philip Richard
 

DR4907-0708-151-001
Investigation of Standards and Regulations for the S-CO2 Plant
Steven Hall
DR4907-0708-153-001
Layout for Supercritical Carbon Dioxide Power Plant
Brian Warren

TDR4907-0708-151-001
Using style sheets to control the appearance of a website
Steven Hall
TDR4907-0708-151-002
Modification of Fluid Properties Function to Accept Various Inputs
Steven Hall
TDR4907-0708-151-003
Development of CAMLD in 2007-2008
Steven Hall
TDR4907-0708-153-001
Parametric Datum Structure Construction for the S-CO2 Plant in Pro|ENGINEER
Brian Warren

DR4907-0809-150-001
Failure Mode and Effects Analysis on New Corrosion Test Rig
Terence Loring
TDR4907-0809-150-001
DR and TDR Numbering System and Association Spreadsheet
Terence Loring
TDR4907-0809-150-002
Description of the Cycle Parameters Schematic
Terence Loring
TDR4907-0809-150-003
Description of the Failure Mode and Effects Analysis on New Corrosion Test Rig
Terence Loring
TDR4907-0809-150-004
Miscellaneous Tasks for the Design Integration Team
Terence Loring
TDR4907-0809-150-005
Information for Organizing a Team Field Trip
Terence Loring
TDR4907-0809-150-006
Preliminary Stress Analysis of the Printed Circuit Heat Exchanger
Terence Loring
DR4907-0809-151-001
Timesheet Design
Andrew Shearer
DR4907-0809-151-002
Timesheet Reporting
Andrew Shearer
DR4907-0809-151-003
Weekly Update Sheets
Andrew Shearer
DR4907-0809-151-004
MS Project Configuration
Andrew Shearer
DR4907-0809-151-005
CAMLD Analysis
Andrew Shearer
DR4907-0809-151-006
Pro/E Plant Layout
Andrew Shearer
TDR4907-0809-151-001
VBA Scripts
Andrew Shearer
DR4907-0809-152-001
Updating the Website: 2008-2009
Michael Snow
DR4907-0809-152-002
Making the Request a Report Number Form
Michael Snow
DR4907-0809-152-003
The 2008-2009 Discussion Board
Michael Snow
DR4907-0809-152-004
Pipe Selection
Michael Snow
DR4907-0809-152-005
DR/TDR Template
Michael Snow
TDR4907-0809-152-001
Using Jack's Formmail to Create a Form
Michael Snow
TDR4907-0809-152-002
Creating a Discussion Board
Michael Snow
TDR4907-0809-152-003
Pipe and Insulation Materials
Michael Snow
TDR4907-0809-152-004
Pipalator
Michael Snow
TDR4907-0809-152-005
Pipe Design Process
Michael Snow
 

DR4907-0910-150-001
2010/11 Design Integration Group Starting Point
Integration Group
 
DR4907-0910-151-001
Progress Tracking
Brian Mattock
 
DR4907-0910-151-002
Progress Tracking, Task Tracking and Time Tracking
Brian Mattock
 
DR4907-0910-151-003
Part and Parameter Tracking
Brian Mattock
 
DR4907-0910-151-004
Planning Process for the 2009-2010 Project Field trip
Brian Mattock
 
TDR4907-0910-151-001
2009-2010 Plant Animation
Brian Mattock
 
DR4907-0910-152-001
Team Communication
Paul Stronge
 
DR4907-0910-152-002
Joint and Fitting Sizing for Standardized Piping
Paul Stronge
 
DR4907-0910-152-003
Form2Excel and Mail Installation and Use
Paul Stronge
 
DR4907-0910-152-004
Pipe Length Changes
Paul Stronge
 
TDR4907-0910-152-001
Flange and Gasket Selection for Standardized Piping
Paul Stronge
 
TDR4907-0910-152-002
Joint and Fitting Sizing for Standardized Piping
Paul Stronge
 
TDR4907-0910-152-003
Wiki Introductory Tutorial
Paul Stronge
 




This page last updated: 13/04/2010